General contracting and construction services for:
- Approximately 365m2 of concrete curb and sidewalk removal.
- Approximately 60 m of concrete curb removal.
- Approximately 660m2 of new Multi-Use Path.
- Approximately 45m2 of new concrete sidewalk.
- Approximately 260m of new High-Back curb and gutter, with 3 pedestrian letdowns.
- Approximately 55m2 of Class 25 Rip-Rap.
- Storm Sewer Upgrades, 2 new Top Inlet Catch Basins with 250mm leads, reuse and reinstall 3 existing Top Inlet Catch Basins and install 1 new Top Inlet Catch Basin.
- Abandon existing 3 storm leads and catch basin.
- 8 Ornamental Light Standards complete with new concrete bases.
Optional Works:
- Approximately 260m2 sidewalk complete with 2 pedestrian letdowns and roadway signage.
- 2 Concrete Outfall structures
All documents are available on BC BID Opportunity ID:226542