Click to Home
Go To Search
City of Salmon Arm
Box 40
500 2 Ave. NE
Salmon Arm, BC V1E 4N2
Ph: 250.803.4000
Fx: 250.803.4041
Hours: 8:30am - 4:00pm
Summer Maintenance
Paving Project Information
  • View more information on paving locations and dates, as well as other city projects: City Projects
  • View a list of previous years’ paving: Paving Programs

Summer Maintenance
Each summer the City of Salmon Arm undertakes a road maintenance program. Sweeping, paving, crack sealing, asphalt pothole filling and micro resurfacing of deteriorated asphalt surfaces are performed on paved surfaces. Additional hard surface maintenance is performed on concrete curb and sidewalks as trip hazards appear or concrete deteriorates.

In rural areas, gravel roads are graded, and dust abatement and gravel replenishing program are done. In addition, ditches are maintained to provide a storm management system where underground piping is not present, foliage is removed and ditches are reprofiled on a priority bases. Bridge decks and parapet walls are inspected and upgraded as necessary.